Oracle Primavera Baselines API
Project baseline operations
Oracle Primavera Baselines API is one of 9 APIs that Oracle Primavera publishes on the APIs.io network, described by a machine-readable OpenAPI specification.
Tagged areas include Baselines. The published artifact set on APIs.io includes an OpenAPI specification, API documentation, an API reference, and a changelog.
This API exposes 1 operation across 1 path, and defines 2 schemas. It is described by OpenAPI 3.2.0, at version 26.0.0.
Requests are made against a single base URL, https://{host}/p6ws/rest/v1.
Metadata
The identity and technical contract details declared by the specification.
Authentication & Security 2
Oracle Primavera Baselines API declares
2 security schemes
for authenticating requests.
It accepts HTTP basic authentication (basicAuth).
It supports OAuth 2.0 (oauth2) using the authorizationCode flow, exposing 2 scopes.
By default, every request must be authenticated.
basicAuth— HTTP Basic Authentication with P6 username and passwordoauth2— Oracle Identity Cloud Service OAuth2
Paths & Operations 1
Across 1 path, the API surfaces 1 operation — 1 GET. Each is listed below with its method, path, parameters, and response codes.
Project baseline operations
Schemas 2
The contract defines 2 schemas that model the data the API accepts and returns. The most detailed are Baseline (5 properties), Error (2 properties). Each schema is shown below with its type and property counts.
Specification
The full machine-readable OpenAPI contract behind this narrative.
Source
More from Oracle Primavera 8
Other APIs Oracle Primavera publishes across the network.
This is an independent, third-party profile of Oracle Primavera Baselines API, published by API Evangelist. We do not operate, host, resell, or support these APIs, and we are not affiliated with or endorsed by the company unless stated above. Everything here is built from publicly available information — the company's own site, developer portal, documentation, public repositories, and the specifications it publishes for public use. Nothing is obtained by breaching a system, defeating an access control, or using credentials.
The Kin Score and Agent Readiness rating are independently calculated assessments of a company's public API artifacts, scored against a published rubric. They are not certifications, endorsements, security assessments, or audits.
Corrections, re-scores, and removal are free — no partnership or purchase required, and you do not need to justify the request. A removed company is recorded as unrated, never scored zero for having asked. Acknowledgement within one business day; removal within two.
info@apievangelist.com
·
Read the full data-sourcing policy →
On a security or compliance team? Put security in the subject line and
you will get a person, not a form — we will tell you exactly which public URLs this profile was built from.