Bentley Systems Work Breakdown API
Work Breakdown resources for the iTwin Schedules API.
Bentley Systems Work Breakdown API is one of 87 APIs that Bentley Systems publishes on the APIs.io network, described by a machine-readable OpenAPI specification.
Tagged areas include Work Breakdown. The published artifact set on APIs.io includes an OpenAPI specification, API documentation, and an API reference.
This API exposes 2 operations across 1 path. It is described by OpenAPI 3.2.0, at version 1.0.
Requests are made against a single base URL, https://api.bentley.com/schedules.
Metadata
The identity and technical contract details declared by the specification.
Authentication & Security 1
Bentley Systems Work Breakdown API declares
1 security scheme
for authenticating requests.
It supports OAuth 2.0 (OAuth2) using the authorizationCode flow, exposing 1 scope.
By default, every request must be authenticated.
OAuth2— iTwin Platform OAuth2 — Bentley IMS
Paths & Operations 2
Across 1 path, the API surfaces 2 operations — 1 GET, 1 POST. Each is listed below with its method, path, parameters, and response codes.
Work Breakdown resources for the iTwin Schedules API.
Specification
The full machine-readable OpenAPI contract behind this narrative.
Source
More from Bentley Systems 12
Other APIs Bentley Systems publishes across the network.
This is an independent, third-party profile of Bentley Systems Work Breakdown API, published by API Evangelist. We do not operate, host, resell, or support these APIs, and we are not affiliated with or endorsed by the company unless stated above. Everything here is built from publicly available information — the company's own site, developer portal, documentation, public repositories, and the specifications it publishes for public use. Nothing is obtained by breaching a system, defeating an access control, or using credentials.
The Kin Score and Agent Readiness rating are independently calculated assessments of a company's public API artifacts, scored against a published rubric. They are not certifications, endorsements, security assessments, or audits.
Corrections, re-scores, and removal are free — no partnership or purchase required, and you do not need to justify the request. A removed company is recorded as unrated, never scored zero for having asked. Acknowledgement within one business day; removal within two.
info@apievangelist.com
·
Read the full data-sourcing policy →
On a security or compliance team? Put security in the subject line and
you will get a person, not a form — we will tell you exactly which public URLs this profile was built from.